The BCUA C-210-A project involves constructing a new pump station and decommissioning the Edgewater Water Pollution Control Facility (WPCF), redirecting flow to the Little Ferry WPCF.

The Bergen County Utilities Authority (BCUA) project C-210-A encompasses the construction, commissioning, and startup of a new pump station, as well as the decommissioning of the existing water pollution control facility in Edgewater, New Jersey.  This initiative is a crucial part of a broader effort to modernize infrastructure and greatly enhance water management efficiency within the region, ensuring compliance with State mandates and effectively addressing both current and future water management requirements.

The project is focused on the Construction of a state-of-the-art pump station designed to transfer sewage from the Edgewater Plant to the Little Ferry WPCF.  This facility is equipped with the capacity and capabilities needed to meet the stringent statewide Water Quality Management standards and regulatory compliance. Upon the start-up and commissioning of the new Edgewater Pump Station, the existing treatment facility will be taken offline, shutdown, and decommissioned

Client:

Bergen County Utilities Authority


Scope of Work:
  • Demolition of Existing Dewatering Building
  • Pre-Drilling, Soil/Rock Excavation & Disposal, Temporary SOE and Tie-down Anchors
  • Construction of Wet Well – Foundations Slab, Walls, Roof and Interior Wet Well Concrete Features
  • Construct Precast Building for Operation and Control of Pump Station
  • Inst Windows, Glazing, Skylight, Doors, Overhead Doors
  • Electrical, Mechanical, HVAC, Plumbing, Instrumentation
  • Painting, Waterproofing including 2″ rigid insulation
  • Site Utilities – Storm, Sewer, Water, Gas and Temp Sewer Bypass Pumping for Tie-ins and Start-up
  • Construction of Retaining Site Walls
  • Pump Station Start up and Commissioning
  • Decommission Existing Treatment Plant Facility After Pump Station in On-line