The Garden State Parkway is one of the most traveled roads in New Jersey. This project makes major improvements to high-priority bridges that are in need of repair while limiting impact to the commuters.
The work to be performed under Contract No. P100.511, Bridge Deck and Median Reconstruction, Milepost 160.6 to 162.5, consists of the demolition and complete replacement of concrete bridge decks for five (5) bridges on the Garden State Parkway (GSP) between Milepost 160.6 to 161.5 and the replacement of the entire superstructure of two (2) bridges utilizing Accelerated Bridge Construction (ABC) methods with Prefabricated Bridge Units. This contract will also include deck repairs and resurfacing to six (6) bridges on the Garden State Parkway between Milepost 160.6 and 162.5.
The work will be accomplished in stages while maintaining the flow of traffic by utilizing multiple lane shifts and a precast concrete construction barrier.