Conti Civil has worked for a wide range of customers in the Power & Utility market constructing plant foundations, site utilities, compressor stations, design-build of HVDC converter stations, and black start systems. Our ability to self-perform most foundation operations and utilities allows us to be competitive when a customer requires a demanding schedule to be performed safely.
Conti is responsible for Phase I of a three-phase multi-year fuel system modification program. We are decommissioning the old single-wall welded steel pipe and installing approximately 29,000 linear feet of buried 22-inch double-wall steel pipe for the aviation fuel main line.
Conti delivered this turnkey EPC contract to build the water supply and discharge systems that the power plant required.
Conti was hired to restore the property and performed state of the art remediation techniques to remove Market Street’s contaminants.
Named a Best Project of 2015 by Engineering News-Record, this new black start system provides immediate power regeneration in the event of an electricity outage emergency.
In an effort to increase the efficiency and coverage of its piping systems in Pennsylvania, UGI contracted Conti to install a length of pipeline in Mechanicsburg.
Conti worked on an aggressive, fast-track schedule to provide Transco with a quality, fully-operational gas compressor station. Conti’s workforces performed a minimum of ten hours a day, six days a week to complete construction on schedule.
Conti self-performed logistically challenging excavation and construction of the civil foundations for all buildings of this new power plant.